Share

WG B1.11 Upgrading and Uprating of underground cables

Frederic Lesur (FR) - 2004 - 2007

Electra 279 (April 2015) - TB 606

The goal of this Working Group is to investigate the ways to increase the power transmission capacity of existing lines by either increasing the voltage level

WG B1.11 Upgrading and Uprating of underground cables (pdf, 41kB)